Washington County Notice of Commencement Form: Fill & Record
Fill in your Notice of Commencement free and see it on the statutory form before you pay. $19 once ($29 with the Notice of Termination); notary and clerk fees extra.
Fill it in freeFill in your Washington County Notice of Commencement: free preview
See the notice filled in with your property, owner and contractor before you pay. $19 once ($29 with the Notice of Termination). The owner signs before a notary and records it.
Short answer for Washington County: record it with the Washington County Clerk of the Circuit Court & Comptroller in Chipley, by mail, or by e-recording through Simplifile or CSC, and post it before the first inspection. The Clerk's fee is $18.50 for a 2-page notice.
Fill in my Washington notice ($19)
- Where: Clerk of the Circuit Court & Comptroller, 1293 Jackson Avenue, Chipley; Monday to Friday 8:00 a.m. to 4:00 p.m. Central time. Or by mail to P.O. Box 647, Chipley, or e-recording with Simplifile or CSC.
- Fee: $10.00 first page + $8.50 each extra page (the Clerk's published fees, matching s. 28.24), so $18.50 for a 2-page notice; $1.00 per name over four.
- When: record it, then post a certified copy (or a notarized filed-for-recording statement with a copy) at the job site before the first inspection. Work must start within 90 days after recording (s. 713.13(2)).
- Who signs: the owner or lessee (or, for a company, its authorized officer, director, partner or manager), acknowledged by a notary; s. 713.13(1)(g) says no one else may sign in the owner's stead.
Fill in your Washington County Notice of Commencement online. Answer plain questions and download the section 713.13 form laid out for recording, the filed-for-recording statement, and signing, recording and posting steps in English and Spanish. $19 one time (notary and clerk fees extra); the $29 plan adds the Notice of Termination. Free check: do I need one?
Form checked against section 713.13(1)(d), Florida Statutes (2026), on November 22, 2026; see a filled sample. Doing it yourself? The statutory text is free in section 713.13(1)(d). We fill in the statutory form from your answers. You sign, notarize and record it. PermitReady FL is self-help form software, not a law firm, and is not affiliated with the Washington County Clerk of the Circuit Court & Comptroller or any government agency.
In Washington County, notices of commencement are recorded by the Washington County Clerk of the Circuit Court & Comptroller. Washington County is on Central time. Here is what the Clerk and the permit office publish, and the state rules that go with them.
1. Get the form and fill it in
Florida uses one statewide form (section 713.13(1)(d)): the property description, a general description of the improvement, the owner's and contractor's names and addresses, the surety and lender if any, the person designated to receive notices, and the expiration date. Leave a 3 x 3 inch space at the top right of page 1 and 1 x 3 inches on each later page for the recording label (s. 695.26(1)(e)). The Clerk's recording page offers a recording cover sheet but no notice of commencement form; the statutory form works anywhere. Do not put Social Security, bank or card numbers on it (s. 119.0714).
2. Sign before a notary and record it
| Option | What the Clerk publishes |
|---|---|
| In person | Clerk of the Circuit Court & Comptroller, 1293 Jackson Avenue, Chipley, FL 32428. The Clerk's recording page lists suite #100 and (850) 638-6289, and its department directory lists suite 101 and (850) 638-6285; hours are Monday to Friday, 8:00 a.m. to 4:00 p.m. Central. |
| By mail | P.O. Box 647, Chipley, FL 32428. The Clerk does not publish who to make the check payable to, so call first and include a self-addressed stamped envelope for the recorded original. |
| E-recording | The Clerk says: “The Washington County Clerk's Office is successfully e-recording with Simplifile and CSC.” Vendors charge their own fees on top of the recording fee. |
3. The fee
The Clerk publishes $10.00 to record the first page and $8.50 for each subsequent page (the section 28.24 amounts), so a two-page notice is $18.50, plus $1.00 per name for indexing over four names.
4. Post it before the first inspection
The statute allows a certified copy of the recorded notice or a notarized filed-for-recording statement with a copy to be posted at the job site (section 713.13(1)(a)). If the direct contract is greater than $5,000, a copy (or its instrument number) also goes to the building department before the first inspection (section 713.135(1)(e)); repair or replacement of an existing heating or air-conditioning system under $15,000 is exempt (section 713.135(1)). The Washington County Building Department (1331 South Boulevard, Suite 900, Chipley; 850-638-6195; Monday to Friday 8 a.m. to 4 p.m.) issues permits. Its permit application says: “For improvements to real property with a construction cost of $2,500 or more, a certified copy of the Notice of Commencement is required to be submitted to the Washington County Building Department when application is made for a permit or the applicant may submit a copy of the Notice of Commencement along with an Affidavit attesting to its recording,” and that a certified copy “must be provided to Building Department and posted on the jobsite before the first inspection can be performed.” For comparison, section 713.02(5) exempts an improvement with a direct contract price of $2,500 or less from Part I of chapter 713 (construction liens) except section 713.05, and section 713.135(1)(e) requires the building-department copy when the direct contract is greater than $5,000. Section 713.135(1)(f) also says the office issuing the permit shall “not require that a notice of commencement be recorded as a condition of the application for, or processing or issuance of, a building permit”; the copy is still due before the first inspection. Follow what your permit office asks, and ask it if you have questions about when it needs the notice. Inside Chipley, the city's development guide says the county building department issues building permits and that approval by the City comes first; the county's new-construction permit instructions also ask for a letter from the Town of Wausau, Ebro or Caryville for new development in those towns, and, inside Vernon, a letter that water and sewer are available. Ask the town what it needs for other work.
5. Ending it: the Notice of Termination
When the work is done, a Notice of Termination ends the notice before its expiration date; it is recorded with the Clerk the same way. Work must start within 90 days after the Notice of Commencement is recorded (section 713.13(2)), and a notice expires 1 year from recording unless it states a different date.
Fill in your Washington notice
PermitReady FL gives you the section 713.13 form with the recording space laid out, ready to sign, notarize and record in Washington County, with steps in English and Spanish. See plans from $19 or use the free NOC checker. New to the form? Read the Notice of Commencement line by line.
Fill it in freeSee the notice filled in with your property, owner and contractor before you pay.
Other counties: Sarasota · Pasco · Lee · Pinellas · Hillsborough · Orange · Palm Beach · Broward · Miami-Dade · Collier · Polk · Volusia · Brevard · Seminole · Duval · Osceola · Manatee · St. Lucie · Lake · Marion · Leon · Escambia · Charlotte · Martin · St. Johns · Alachua · Clay · Okaloosa · Hernando · Santa Rosa · Bay · Citrus · Indian River · Sumter · Flagler · Highlands · Nassau · Monroe · Walton · Putnam · Columbia · Suwannee · Jackson · Gadsden · Hendry · Levy · Okeechobee · Wakulla · DeSoto · Baker · Hardee · Bradford · Holmes · Union · Taylor · Calhoun · Gulf · Liberty · Franklin · Jefferson · Madison · Dixie · Gilchrist · Lafayette · Hamilton · Glades · All 67 counties
Sources
- Washington County Clerk: Recording
- Washington County Clerk: Departmental directory
- Washington County Clerk: Records search
- Official records search (Washington)
- Washington County Building Department
- Washington County building permit application (2025)
- Washington County residential permit instructions
- City of Chipley: Development guide
- Section 713.13, Florida Statutes
- Section 713.135, Florida Statutes
- Section 28.24, Florida Statutes
Last reviewed November 23, 2026 against the Washington County Clerk of the Circuit Court & Comptroller's published pages, the county and city permit pages and the 2026 Florida Statutes. PermitReady FL is self-help form software, not a law firm, and is not affiliated with the Washington County Clerk of the Circuit Court & Comptroller or any government agency.