Your Florida Notice of Commencement, filled in and ready to record
Answer plain-English questions and download the section 713.13 form for your county, laid out the way Florida clerks record it, with signing, recording and posting steps in English and Spanish. From $19, one time.
Secure checkout by Stripe. Instant access after payment. Full refund within 30 days.
Notice of Commencement checker
Based on sections 713.13, 713.135 and 28.24, Florida Statutes (2026). Recording fees are paid to the county clerk. General information, not legal advice.
Who it is for
Homeowners
Re-roofs, pools, additions, impact windows, solar: permitted jobs over $5,000.
Owners working with a contractor
Your contractor can send you this page: you enter your own facts and sign, and the contractor gets the recorded copy for the first inspection.
Companies that own property
Your authorized officer or manager completes and signs the notice for the company’s own property.
Landlords and investors
Notices for improvements on property you own, every county, one consistent form.
How it works
Answer the questions
Property, owner, contractor, lender and surety if any, and who prepared it.
Download and sign
The owner signs in front of a Florida notary, in person or online.
Record and post
Record it with the county clerk and post a copy at the job site before the first inspection.
What you get
Notice of Commencement
Permit No. BD26-104471 Tax Folio No. 30-4021-015-0270
State of Florida County of Miami-Dade
The undersigned hereby gives notice that improvement will be made to certain real property, and in accordance with Chapter 713, Florida Statutes, the following information is provided in this Notice of Commencement.
2. General description of improvement: Re-roof of single-family residence, concrete tile
Statutory form, Fla. Stat. 713.13(1)(d). Example values only.
Statutory NOC form
Items 1 to 9, the warning to owner, the signature and the notary block of s. 713.13(1)(d).
All 67 counties
Pick the county and the form follows; the fee table is the same statewide.
Recording-ready layout
Clerk space on every page, printed name and address under the signature and a preparer block (s. 695.26).
Filed-for-recording statement
The notarized statement you may post with a copy while the clerk records the notice (s. 713.13(1)(a)).
Notice of Termination
Close out the job with the s. 713.132 contents and the 30-day rule built in (complete plan).
Fees and dates explained
$10.00 first page, $8.50 each extra page; the 90-day start rule and the 1-year expiration.
Permit application worksheet
Palm Beach Universal, Broward Uniform or Miami-Dade application, box by box from your answers, with the document checklist for your job (Permit package).
Pricing
Notice of Commencement
- Statutory NOC form, any Florida county
- Filed-for-recording statement
- Signing, recording and posting steps in English and Spanish
- Edit and download again as often as you need
- Notary fee is separate: Florida caps it at $10 per signature in person (s. 117.05)
NOC + Notice of Termination
- Everything in the NOC plan
- Notice of Termination generator (s. 713.132)
- Close-out steps with the 30-day rule
- Use both generators for every job for 12 months
Permit package
- Everything in the NOC + Notice of Termination plan
- Permit application worksheet that follows your county’s official form box by box: Palm Beach Universal, Broward Uniform or Miami-Dade
- Document checklist for fences, sheds, patio covers, re-roofs, windows and doors, shutters and A/C change-outs
- Owner-builder steps for your county
- Use every generator for every permit for 12 months
Florida Contractor Pack
- PermitReady FL Notice of Commencement + Notice of Termination kit ($29): self-help forms for your customer, the property owner, who fills them in, signs and records them (s. 713.13(1)(g))
- FL Contract Forms complete bundle ($39): contract, change order, estimate, lien waivers and payment application
- FloridaNTO Notice to Owner kit ($39): statutory notice with your 45-day deadline
- $107 if bought separately
- One page with all three kits right after payment
Secure checkout by Stripe. Instant access after payment. Full refund within 30 days.
Guides and resources
Plain-English answers to the questions we hear most.
Notice of Commencement in Sarasota County: How to Record
Recording a Notice of Commencement in Sarasota County: what the Clerk requires, e-recording providers, mail and office options and the $10 + $8.50 fee.
Read the guideNotice of Commencement in Collier County: How to Record
Recording a Notice of Commencement in Collier County: the Clerk's Naples office, e-recording partners, the $10 + $8.50 fee and posting before inspection.
Read the guideNotice of Commencement in Pinellas County: How to Record
Record a Notice of Commencement in Pinellas County: the Clerk, the $10 + $8.50 fee, and how Building Services wants the recorded copy before inspections.
Read the guideCommon questions
Do I need a Notice of Commencement in Florida?
If the work needs a building permit and the direct contract is more than $5,000, section 713.135(1)(e) requires a copy of the notice (a certified copy, a notarized statement that it was filed for recording with a copy, or the clerk’s recording reference) to be filed with the building department before the first inspection, or later inspections cannot be approved. That permit rule does not apply to a direct contract under $15,000 to repair or replace an existing heating or air-conditioning system. The free checker applies these rules to your job.
Who has to sign it?
The owner. Section 713.13(1)(g) says the owner must sign the notice and no one else may sign in the owner’s place. For a company or trust, the form’s signature line is for the owner’s authorized officer, director, partner or manager. The signature is acknowledged before a notary, in person or by online notarization.
How much does recording cost?
Florida clerks charge $10.00 for the first page and $8.50 for each additional page (section 28.24). Our notice is normally two pages, so $18.50. Certified copies cost extra. These fees are paid to the clerk, not to us.
When must it be recorded and posted?
Before the first inspection. The owner posts at the job site either a certified copy of the recorded notice, or a notarized statement that the notice was filed for recording together with a copy (section 713.13(1)(a)). Work must start within 90 days after recording or the notice is void (section 713.13(2)).
How long is it good for?
One year after recording, unless item 9 gives a different expiration date. Payments made after it expires are improper payments under section 713.13 and can mean paying twice, so give a later date if the job will take longer than a year.
Get started today
Secure checkout by Stripe. Instant access after payment. Full refund within 30 days.